Total cost to perform the process "create materials plan" per $1,000 revenue

This measure calculates the total cost to perform the process "create materials plan" per $1,000 revenue. Total cost is the sum of personnel (compensation/benefits), systems (direct and/or allocated), overhead (direct and/or allocated), other internal, and outsourced costs. The Process "Create materials plan" includes [Developing a scheme that allows for advance planning for the availability of raw materials and spares. Start with an unconstrained plan, and refine based on supply chain realities by identifying critical materials required for production, checking material specifications, and collaborating with all vendors over the supply.]. This Cost Effectiveness measure is intended to help companies understand this cost expenditure related to the process "Create materials plan".

Benchmark Data

Lock

Sorry! Not all users have access to all of our resources.

Want to unlock access to all of our resources?

Learn about Membership Arrow with stem

Measure Category:
Cost Effectiveness
Measure ID:
110945
Total Sample Size:
462 All Companies
Performers:
25th Median 75th
- - -
Key Performance Indicator:
Yes

Sample image showing interactive filters for more detailed measure peer group data and an interactive graph.

Compute this Measure

Units for this measure are dollars.

Back to Top

Total cost associated with the process 'Create materials plan' / (Total business entity revenue * .001)

Key Terms

There are no key terms associated with this measure.
Back to Top

Measure Scope

Back to Top

Cross Industry (7.4)

  • 4.1.3.1 - Create unconstrained plan (10242)
  • 4.1.3.2 - Collaborate with supplier and contract manufacturers (10243)
  • 4.1.3.3 - Identify critical materials and supplier capacity (10244)
  • 4.1.3.4 - Monitor material specifications (10245)
  • 4.1.3.5 - Generate constrained plan (10246)
  • 4.1.3.6 - Define production balance and control (14196)