Finished-product first-pass quality yield for primary products

This measure calculates the percentage of finished primary (or high level) products that meet all quality specifications at a final test point. It is part of a set of Process Efficiency measures that help companies optimize the performance of their "produce product" process by minimizing waste and refining resource consumption.

Benchmark Data

Lock

Sorry! Not all users have access to all of our resources.

Want to unlock access to all of our resources?

Learn about Membership Arrow with stem

Measure Category:
Process Efficiency
Measure ID:
100726
Total Sample Size:
2,716 All Companies
Performers:
25th
-
Median
-
75th
-
Key Performance
Indicator:
Yes

Sample image showing interactive filters for more detailed measure peer group data and an interactive graph.

Compute this Measure

Units for this measure are percent.

Back to Top

Finished-product first-pass quality yield for primary products

Key Terms

Back to Top

Process efficiency

Process efficiency represents how well a process converts its inputs into outputs. A process that converts 100% of the inputs into outputs without waste is more efficient than one that converts a similar amount of inputs into fewer outputs.

Median

The metric value which represents the 50th percentile of a peer group. This could also be communicated as the metric value where half of the peer group sample shows lower performance than the expressed metric value or half of the peer group sample shows higher performance than the expressed metric value.

Measure Scope

Back to Top

Cross Industry (7.3.1)

  • 4.3.2.1 - Manage raw material inventory (10310)
  • 4.3.2.2 - Execute detailed line schedule (10311)
  • 4.3.2.3 - Report maintenance issues (10319)
  • 4.3.2.4 - Rerun defective items (10313)
  • 4.3.2.5 - Monitor and optimize production process (19566)
    • 4.3.2.5.1 - Automate and control plant (19567)
    • 4.3.2.5.2 - Perform advanced process control (19568)
    • 4.3.2.5.3 - Perform real-time optimization (19569)
    • 4.3.2.5.4 - Manage plant alarms and alerts (19570)
  • 4.3.2.6 - Assess production performance (10314)